691819

Work item

(summary)

Description

(details and purpose)

Priority

Tech/non-tech

PBI created

(add number)

Are there dependencies outside TK

Key dependencies

(teams or processes)

Planned completion date

MM-DY-YR

Status details

(latest progress or any notes)

Status (in progress, done)

1

Set-up launch preparation plan in confluence

  • Create a list of items to complete in preparation for MVP launch both technical software related items, release process related and key operational activities.

  • Be very crisp on the priority of the work so that we are planning for completion of anything that will block MVP launch in production.

Important

Non-tech

N/A

-

-

06-04-21

Populating the plan with what is known already.

Status
colourYellow
titleIn progress

2

Shared learning from recent launches in MSS

  • Reach out to other PO/PM that recently launched new functionality to uses in production to learn about steps taken in preparation.

  • MITRACK team launch

Important

Non-tech

N/A

Yes

MITRACK PO/PM

06-18-21

Received some information, compared notes against our draft plans and added anything new.

Status
colourGreen
titleDONE

3

Vessel registry high level process documentation

  • Documentation of business process flow for current state and future state for MVP iteration.

  • This will help for testing of the end to end flow with workload management, and tweak the process so its as smooth as possible for end users.

Important

Non-tech

N/A

Yes

Registrar supervisors, Change management

06-14-21

First part of new process in draft

Status
colourYellow
titleIn progress

34

Release notes and history documentation

  • Create a summary page in Confluence to capture application release and changes including the details of what was released and when.

Important

Non-tech

N/A

-

-

06-18-21

Page has been drafted

Status
colourYellow
titleIn progress

45

Revised registrar work instructions

  • After the new end to end process flow is ready, the detailed registrar instructions will need to be revised to match new process. In scope will be only the instructions that are impacted by MVP rollout and we will minimize change management activities as much as possible (keeping in same repository and current format etc.).

  • This will help rollout training to the impacted daily users of legacy systems and new workload management.

  • Official SOP required?

Important

Non-tech

N/A

Yes

Registrars and registrar supervisors

TBD

56

Training plan of registrars to use workload management

  • Provides an overview of what the new system is and how it works and features that are available

  • This will be in preparation for MVP launch and getting users accustomed to the new tool.

Important

Non-tech

N/A

No?

Registrars and registrar supervisors

TBD

7

Creation of training artifacts

  • Creating or modifying the materials, procedures, user guides that already exist to incorporate the new system

  • Updated process documentation to incorporate the new system and modified reality

  • Bi-lingual contents required here?

8

Execution of the training

  • actually present the training materials and artifacts and post production support materials (SOP’s, tips, guides)

  • bi-lingual training required, through in person or video conference and who does the training

9

MVP rollout strategy and declare target go live date

  • Figure out the segment of service requests that will be used in the system, including launch timelines and percentage of the population.

  • This will be vital part of the MVP rollout plan as it will allow users to be prepared and additional procedural changes that need to be in place depending on the strategy. We can reduce the change management impacts by keeping engagement of non-impacted users to a minimum during the MVP launch.

Important

710

MVP monitoring plan

  • Figure out the key metrics to track process and system stability and how to track the metrics or needed reporting to support.

  • Without key metrics to track it will be challenging to detect issues and problems and to make sure rollout is having the desired impact.

Important

Both

-

Yes

Registrar supervisors, BI team

811

Build MVP operational reporting

Create the reporting infrastructure and dashboards that were in the MVP monitoring plan. Ensure that the reporting requirements are collected from the key stakeholders and they have access to the reporting as necessary.

Important

12

Business approval completed

  • Send requests for approvals and confirm and document the approvals

  • Examples of the approvals might be TAC, ARB, Authority to operate, sign-off from the business customers etc. Are there other that we are missing? If so, lets confirm and document them in here.

Critical

13

14

Modifications to vessel registry forms (pending changes)

  • Long awaited changes that have not been made to the live forms. These changes should improve the process and client experience.

Non-critical

Non-tech

1015

Production release process for MVP

  • Understand the process that needs to be followed including mandatory approvals to go live in production

Critical

Both

1116

Production release process post-MVP

  • [Likely a re-run of the MVP process minus some one time things and no longer applicable actions]

Important

Both

1217

Issue management process

  • How feedback and issues will be reported by users and where/how they will be documented

  • Should include the entire process that we use for MVP and beyond

  • Updates needed to the support desk. Communication of the new application and documentation to provide some level of user support

Important

Both

1318

Runbook (MBM)

Important

Non-tech

Status
colourYellow
titleIn progress

1419

UXR strategy

Important

Non-tech

Status
colourYellow
titleIn progress

1520

Execution of UXR strategy

Important

Non-tech

Status
colourYellow
titleIn progress

1621

Review of UXR results and closure of blocking issues

Important

Non-tech

1722

Go no go decision

Important

Non-tech

N/A

23

Communication strategy pre and post launch

  • How updates on the project will be shared and to whom

  • Do we already have the right forums in place or do we need something special stood up (sprint review is not right forum, maybe we use daily email distribution, confluence page, or blog post on the teams share point, teams channel)

  • Structure of the communication? What key metrics or highlights.

Important

Non-tech

N/A

24

User acceptance testing strategy

  • The plan should be drafted here, what needs to be tested and the start and duration and how success will be determined

Important

Both

2025

Execute post production testing plan

Important

2126

Provision and deploy to pre-production environments

Critical

Yes

Cloud team?

Status
colourYellow
titleIn progress

2227

Provision and deploy to production environments

Critical

Yes

Cloud team?

2328

Approvals to launch in production

Critical

Yes

?

2429

2530

2631

2732

New system of record for to house the procedures from the G drive

  • Training and help documentation is currently in housed in a different repository from workload management. Ideally we can bring the help documentation closer to where the need for it arise, inside vessel registry so its easily accessible during day to day. More thought and options need to be explored for this work.

  • Supports accessibility and easy of updating and keeping documentation fresh and relevant.

High

Both?

-

Yes

Registrars and registrar supervisors

2833