Reviewed with team on May 12, 2021

Team Kraken’s Definition of Done (updated: )

/wiki/spaces/NT/pages/1185972309 is an agreed upon list of items that must be completed before PBI can be considered complete. The PBI is either done or not done – there is no 80% or “almost” done.

It is an agreed upon list to build a quality Product Increment by the end of sprint.

Revised DoD as of

...

of

Definition of Done - WHAT 

Definition of Done  - HOW 

  • PBI / Bug fixes meet all Acceptance Criteria  

  • PBI : Conforms to the user story set out by PO/ UX 

  • Bug : Conforms to expected behaviour set out by PO/ UX 

  • Code is peer reviewed by 1 people (2 person as needed to be determined by team) and approved via pull request process. 

  • Tag on Devops (@all devs) and message (@all devs) on MS Teams (Dev chat) channel to review 

  • Person who wrote code will follow up if not reviewed 

  • Pull requests are currently captured in Repos 

 

  • Code is tested before

...

  • & after the pull request. 

  • All automated testing / unit testing passes (if available and needed).  

  • Perform required functional  testing if necessary 

  • Create unit test as required 

  • Add notes if testing cannot be performed 

  • Run test locally to reduce impact on other code (If failed, fix before pull request) 

  • Use Azure Devops automation pipeline functionality  

  • Functional testing are captured within ‘in progress’ column 

    • Functional testing is completed when dev runs program locally  

  • Unit testing – run through task on ADO pipeline to ensure it meets expected behaviours and functions  

 

  • Work should be aligned to WCAG2.1 Level AA Standard

WCAG verifier (WAVE) is currently used by developers. 

  • All tasks associated with the PBI / Bug are set to DONE

  • The person who performs functional testing should set PBI to done. 

  • Attach relevant documents to PBI / Bug

...

PBI / Bug is testable.

...

Database model updates and Translation are not included as part of our DOD

  • (ie. scripts, certificate pdf templates, etc.) 

  • Attach relevant documentations to PBI 

 

  • Built-in text (UI elements) of the application will be localized to English and French. (Exceptions will be handled on case by case basis) 

  • English text will provided with user story (provided by Troy)  and added to resource file 

  • Devs ask for assistance French translation (Karen, Troy)  and add it to resource file  

  • UX provides input on text layout in EN/ FR in Figma  

 

  • Secure coding standards and best practices are followed (e.g. KeyVault, password security, no protected B info) 

On we revisited DOD and below are the key decisions/ next steps

Decisions/ Key Takeaways

  • We are getting rid of Acc Ready column 

  • Merging into acceptance is not part of the ‘definition of done’

  • The person who completes functional testing sets PBI as done (usually/ historically this person is Troy)

  • Done = coding is completed and functional testing is done 

To be discussed 

  • unit testing and how it fits in our development process/ DOD

...

Revised DoD as of

These are the conditions which must be met within a Sprint for a PBI/Story to be considered done so the PBI/Story can be closed:

  • PBI / Bug fixes meet all Acceptance Criteria

  • Code is peer reviewed by 2 people (min 1 person) and approved via pull request process.

  • Code is tested before and after the pull request.

    • All automated testing / unit testing passes (if available and needed).

    • Perform required functional / load/ regression testing if necessary

    • Create unit test as required

    • Add notes if testing cannot be performed

  • Work should be aligned to WCAG2.1 Level AA Standard.

  • All tasks associated with the PBI / Bug are set to DONE

  • Attach relevant documents to PBI / Bug (ie. scripts, certificate pdf templates, etc.)

  • Built-in text (UI elements) of the application will be localized to English and French. (Exceptions will be handled on case by case basis)

  • Secure coding standards and best practices are followed (e.g. KeyVault, password security, no protected B info)