Main Articles
Background
In 2016, the AAIR Electronic Distribution Module (EDM) replaced the old weekly, hardcopy-only distribution method (form #24-0059), allowing the Continuing Airworthiness Section to contact the majority of AAIR reporters by Email, rather than postal mailing.
SCHEDULE
The Hardcopy/postal distribution method was originally based on the anniversary of Certificate of Airworthiness date, for each individual aircraft. This created a large postage expense, and many aircraft were skipped in annual distributions due to ownership changes and C-OF-A changes.
Currently, the EDM process is run 4 times annually , using the following schedule :
First run - 1st week of January each year for operators having a 30-March due date (this covers 98% of all operators)
Second run - 1st week of March for operators having a 30-May due date
First Overdue run - 1st week of May or June for all operators that have not yet reported
Second Overdue run - 1st week of September for all operatCuors operators that have not yet reported
HOW TO UPDATE TEMPLATES
For email:
Update the following records in table A33_CAWIS_ATTACHMENTS.
a. AAIR_NOTICE-1-en.txt
b. AAIR_NOTICE-1-fr.txt
c. AAIR_OVERDUE-1-en.txt
d. AAIR_OVERDUE-1-fr.txt
For Fax:
Update the following records to modify the 1st page of fax template in table A33_CAWIS_ATTACHMENTS.
a. AAIR_NOTICE-2-en.txt
b. AAIR_NOTICE-2-fr.txt
c. AAIR_OVERDUE-2-en.txt
d. AAIR_OVERDUE-2-fr.txtSend the png format of ‘AAIRNotificationGuide.htm’ located in the Files folder to whoever manages RightFax.
For SnailMail:
Call the printing company. We do not need to do anything on our side.
EDM STEPS
EMAIL - this step can take anywhere from either 48 hours to -or- 20 minutes in more recent runs (for about 25,000 emails ). The Exchange server is under shared services and may behave differently on each run. Also, this This part of the process has been extremely sensitive to Exchange server changes or Outlook upgrades in the past.
FAX (this method is no longer used)
FTP TO CSV FILE FOR HARD COPY PRINTING and MAILING (IMPORTANT NOTE: It is necessary to run this step producing the CSV file in order to upload success/fail codes regarding the email portion of the EDM to the AA003 table)
Special Note : The EDM should NOT be run on or near the end of any given month. If the email portion is not completed by 12:00am on the 1st of the next month, double emailing can occur.
EXCEPTIONS to Distribution
An EDM run gathers aircraft-owner-contact-info where the aircraft data meets the following criteria :
All currently registered aircraft having an AAIR due date (y02 table) that falls within 3 months of the EDM run date (Note: any given “run-date” can be input into the EDM routine, the default is current date )
It will reject the aircraft displaying the following conditions
Ultralight aircraft (flight authority “H”,”I” on the Q01 table) Not required to report.
Aircraft ALREADY having completed an AAIR for the current-reporting-year. (Aircraft has an M01 record already having a report-received-date for the current reporting year)
Current-reporting-year is always Current-year - 1 (year calendar number on M01)
Many operators submit their AAIR reports beginning on January 1st of each year, without being notified
Out of service aircraft where the out-of-service period begins earlier than the reporting year have M01 records with recd dates auto-inserted and Zero flight hours auto-recorded (Q02).
...
Success/fail data is available on the AAIRDATA-yyyy-mm-dd.xlsx report described here:
As of April 2022, the AAIRDATA report is available from the CAWIS reports menu, but note - This report only contains a snapshot of data from 1am last night. Running this report directly after an EDM will not produce the information you need. It has to be requested on the next day.